1325 East 16th Ave, Denver, CO 80218

Group14 provided retro-commissioning services for eight Denver Public School projects totaling over 900,000 SF. Our process was used to troubleshoot equipment operation and lower energy use for existing schools. Group14 utilized SkySpark MBCx software to enhance the retro-commissioning process and monitor facilities over time. SkySpark monitoring helped to identify additional issues and refine operation.

Systems evaluated included central air handling units, make-up air units, energy recovery units, heat pumps (ground source and central boiler/cooling tower systems), heated and chilled water central plants, and a variety of zone level equipment.

Results:

Group14 identified over $250,000/year in energy savings, around 20% of the total energy cost for the schools evaluated. Beyond energy savings, Group14 helped to improve the comfort and indoor air quality for the occupants, which is vital in a school environment.

“The AC has been cycling on and off, high and low, just like it’s supposed to, for the last two weeks. I couldn’t be happier and I almost feel like a new person!”

– Slavens K-8 Music Teacher after commissioning repairs were completed.

 

Services:

  • Retro-Commissioning (RCx)
  • Monitoring Based Commissioning (MBCx)Fault Detection & Diagnostics/ SkySpark

Snapshot:

  • City – Denver, CO
  • Project Size:
    • DPS West HS: 294,047 SF
    • Slavens K-8: 75,000 SF
    • Montbello Campus: 277,000 SF
    • Samsonite Building: 90,000 SF
    • School of the Arts: 202,700 SF
    • DSST Montview MS & HS: 105,000 SF
    • Ash Grove Elementary: 52,000 SF
    • DSST Byers: 100,000+ SF

Similar Clients

Questions about K – 12?

Contact us to get the conversation started.

Contact Us

©2023 Group14 Engineering. All rights reserved.