1325 East 16th Ave, Denver, CO 80218

Group 14 provided fundamental & enhanced commissioning, energy modeling, EDA, and LEED services for the Kaiser Permanente Centrepoint project, which included a 68,000 SF renovation and 4,200 SF addition. The project was constructed over seven phases to allow continued operation of the building while renovations were in progress. The two-story medical office building includes primary care spaces, an urgent care, laboratory, and a pharmacy.

Systems Commissioned included Air-Handling Unit(s), HVAC, BAS, Central Plants, Pumps, Lighting Control Systems/Lighting Control Devices, Advanced Energy Metering, and Air Quality Systems/CO2 Sensors.

Energy and sustainability design strategies included high performance glazing, efficient lighting with occupancy sensors, condensing boilers, and the installation of a 95% efficient domestic hot water heater.

RESULTS:

The project achieved energy cost savings of 37.2% over the LEED baseline. The MOB is also on track to achieve LEED Gold and received $78,600 in incentives from Xcel Energy’s EDA program.

 

Services:

  • LEED Consulting
  • LEED Documentation
  • Energy Modeling
  • Energy Design Assistance (EDA)
  • Fundamental Commissioning (Cx)
  • Enhanced Commissioning (Cx)

Snapshot:

  • City – Aurora, CO
  • Project Size – 70,692 SF

Similar Clients